Before
After
Before
After
Benefits
RAULINER Applications
Root Faults | Renovation Possible | Required Preparation Works |
Leakage | √ | - |
Blockage | √ | Removal of blockage |
Sub-sidance / Ground Movement | Only in combination with preparation works | Re-alignment milling |
Mechanical wear | √ | - |
Corrosion | √ | - |
Deformation | Conditional (Up to 5% only) | - |
Cracks | √ | - |
Partial Fragmentation | √ | Repair / only for large fragmentations |
Partial Collapse | √ | Removal of blockage |
Deffective Connections | √ | Milling or filling |
RAULINER branch connection
RAULINER connect with existing pipe
Engineering progress
Enhancing lives
Maximum cart size of 3 items has been reached!