Speed and flexibility from polymer
Not originally specified for the project, the flexibility, durability and performance of REHAU’s RAUTITAN, convinced the consultant and mechanical contractor to reconsider the original specification. The quick-to-install solution was a clear choice for the contractors to address the challenges brought about by the high-specification development, and the design was adapted to include RAUTITAN instead.
“When it comes to PE-Xa pipework such as RAUTITAN, you have more durability and flexibility than you would have with metal equivalents,” said Alvaro Marin. “On top of this we were impressed by the robust jointing system and compression sleeves during a demonstration of the product from a REHAU representative. With this system you get great durability at high pressure thanks to this jointing, and, when we put it to the client, we agreed it was the clear choice for this high-specification project.”
The pipework was installed into concealed ceiling areas and delivered water to the building services such as the kitchens, bathrooms, and boiler and cylinder cupboards. Thanks to the lightweight polymer and quick, secure jointing, the system was installed quickly and easily in the space, especially given that time and space were at a premium while working alongside the other trades onsite.
“The site was very busy and we often found ourselves jumping from apartment to apartment to carry out the installation,” said Michael Moffat of Platinum (Scotland Plumbing) Ltd. “On the whole, we were able to quickly install the pipework and we had a ready supply of materials and tools available so we could get our part done without any issues.” The site was busy with other trades and so the quick jointing system allowed the installer to complete their work quickly, leaving no opportunity for human error to compromise the robustness of the system,” Marin adds. “From that point of view, using RAUTITAN helped in a project of this nature, as it removes concerns about the internal plumbing performance as well as the worries about installation issues with such complicated design.”
Going the extra mile
With time-sensitive and complex developments such as The Pavilion, the availability of construction materials and tools throughout the duration of a project is a key concern for contractors. If supply of certain materials experiences issues, entire aspects of the development can experience delays, which could hold up other processes onsite and potentially cause problems for the purchasers of the properties waiting to move in.
From the outset, the contractors were pleased with the ready supply of product, materials and tools from REHAU through regional sales manager in charge of the project, Mark Taylor. Onsite training was also provided, which meant the installer was not only comfortable with installing a product they may not be familiar with, but could also be ready to quickly install the pipework in the limited windows around the other trades present onsite.